How We Work

From blueprint to frame — built on precision.

Every Wholesale Steel Framing project follows a disciplined four-step process — engineered for clarity, coordination, and zero surprises. Here's exactly what to expect when you build with us.

01
Duration1–2 Weeks
Who's InvolvedYou, your architect, and our engineering team

Design Consultation

Every project begins with a thorough review of your architectural plans, site conditions, and structural goals. Our engineers sit down with your design team to understand the vision — the spans, the cantilevers, the geometry — and identify where steel framing unlocks what wood cannot deliver.

Deliverables

Structural feasibility review
Preliminary framing concept
Budget range estimate
Engineering scope of work

We work directly with your architect of record. If you don't have one yet, we can recommend trusted partners across the Southwest.

02
Duration3–6 Weeks
Who's InvolvedOur in-house structural engineering team

Engineering & Shop Drawings

Once the scope is confirmed, our engineers produce a complete set of structural calculations and shop drawings. Every member is sized, every connection is detailed, and every load path is verified before fabrication begins. Shop drawings are submitted for your architect's and engineer of record's review and approval.

Deliverables

Full structural calculations
Stamped engineering drawings
Shop drawing package
Material & connection schedule

We coordinate directly with your local building department on permit submissions to keep the process moving.

03
Duration4–8 Weeks
Who's InvolvedOur fabrication facility

Fabrication & Pre-Panelization

With approved shop drawings in hand, fabrication begins. We use heavy gauge 18 gauge steel studs throughout — not the light-gauge material used in commercial interiors. Walls are fully pre-panelized in our facility: every stud cut, punched, and assembled into complete wall panels before a single piece ships to your site. Each panel is labeled by wall location and installation sequence.

Deliverables

Heavy gauge 18ga steel studs
Pre-panelized wall assemblies
Sequenced & labeled panels
Quality control inspection report

Pre-panelization means your crew cranes walls into position and sets them in hours — not days. It also eliminates field cutting errors and keeps your site clean.

04
DurationPer construction schedule
Who's InvolvedOur logistics team

Site Delivery

Steel is delivered to your site in sequenced loads that match your construction schedule — not all at once. This keeps your site organized, reduces handling, and lets your crew install directly from the delivery. We coordinate with your general contractor on access, crane requirements, and staging.

Deliverables

Sequenced delivery schedule
Crane & rigging coordination
Delivery manifest & labeling
On-site staging plan

We've delivered to remote mountain sites, coastal bluffs, and tight urban infill lots across the Southwest. Logistics is part of what we do.

Typical Timeline

What to expect, start to finish.

01

Design Consultation

1–2 Weeks

02

Engineering & Shop Drawings

3–6 Weeks

03

Fabrication & Pre-Panelization

4–8 Weeks

04

Site Delivery

Per construction schedule

Common Questions

Questions we hear from every client.

How long does a typical project take from consultation to frame completion?

For a custom luxury residence in the 7,000–12,000 sq ft range, plan on 14–22 weeks from initial consultation to completed frame. Larger or more complex projects may run longer. We'll give you a detailed schedule at the start of engineering.

Do you work with my existing architect and general contractor?

Yes — always. We integrate into your existing project team. Our engineers coordinate directly with your architect of record and GC throughout the process. We're a specialist subcontractor, not a design-build firm.

What states do you operate in?

We're licensed and insured in California, Arizona, Utah, Colorado, Nevada, and New Mexico. Our engineering team is familiar with the specific seismic, wind, and snow load requirements in each state.

Is steel framing significantly more expensive than wood?

For luxury custom homes in the 6,000+ sq ft range, the cost premium over wood framing is typically 15–30% for the structural frame alone. However, steel enables design features — large spans, cantilevers, dramatic openings — that are impossible or prohibitively expensive with wood. Most clients find the value proposition compelling.

Can you handle both the engineering and the installation?

Yes. We offer full-service delivery: structural engineering, fabrication, delivery, and installation. Some clients engage us for engineering and fabrication only, with their GC handling installation. We're flexible based on your project needs.

Ready to Start

Let's talk about your project.

The first step is a no-obligation consultation with our engineering team. Bring your plans, your vision, and your questions — we'll tell you exactly what's possible in steel.

6
Step Process
14–22
Weeks Typical Timeline
500+
Projects Completed
100%
Custom Engineered